Quantcast
Channel: 2BrightSparks
Viewing all articles
Browse latest Browse all 9303

Re: Progress Monitoring and bandwidth usage

$
0
0
Ok will read up on SyncBackPro profile Groups and will await the first profile to finish up in a few days, thus as you refer to it, "frontloading" the container in Azure will be complete.

I assume that this would be as easy as creating the profiles Group and "dropping" my now 2 separate Azure profiles into it. (will read up)

I also assume I should do this with my 2 local profiles taht back up the primary server to a secondary server inside same LAN nitely also.

OR probably even better, bcs as you say it's better to have ALL profiles run sequentially (vs parallel) drop all 4 profiles (2 Azure and 2 local backup inside LAN) to same group and let "group" run them sequentially each weekday night.

Should i remove scheduling from each profile then before adding them to the created GROUP, and have the GROUP itself say start executing at say 9pm each weekday nite..?

Viewing all articles
Browse latest Browse all 9303

Trending Articles