Quantcast
Channel: 2BrightSparks
Viewing all articles
Browse latest Browse all 9303

Re: Log details question

$
0
0
Look again at
Dave Wilkins wrote:"Help > Search > 'variables' (without the quotes) > top hit > Emailing The Log section for the Variables you can use..."

I can see

%DELETEDTOTAL% The total number of files that were deleted.

%SKIPPEDTOTAL% The total number of files that were skipped, e.g. only in the destination and the profile was configured to ignore files that are only in the destination.

%COPIEDTOTAL% The total number of files that were copied.

%MOVEDTOTAL% The total number of files that were moved.

%DATECHANGEDTOTAL% The total number of files whose last modification date & time were copied.

%ATTRIBCHANGEDTOTAL% The total number of files whose attributes were copied.

%RUNBEFOREERROR% If the Run Before program failed (e.g. because it doesn't exist, or couldn't be started) then this is the error message.

%RUNAFTERERROR% If the Run After program failed (e.g. because it doesn't exist, or couldn't be started) then this is the error message.

%COPYERRORSTOTAL% The total number of file copy/delete errors.

%COMPRESSERRORSTOTAL% The total number of errors related to compression.

%NONCRITICALERRORSTOTAL% The total number of non-critical errors.

%WARNINGSTOTAL% The total number of warnings.

amongst many others. Not sure why you can't ;)

Viewing all articles
Browse latest Browse all 9303

Trending Articles